ISO 9001 & SGS Audited | Cut to the Charge Length | Lot Certificate With Every Case
A melting shop that takes its addition already at charge length hands the last step of the job back to the supplier. Pre-cut master alloy charging segments are cut from cast bar in round sections from 8.0 mm to 200 mm, so the pieces reach the floor at the length the furnace accepts and are weighed in rather than broken down.
The metal and the certificate belong to the cast lot; what a segment order adds is the sizing. A lot bound for Korea is cut, marked and released before it leaves the plant, which is what a shop wants when the charge is assembled by hand and every piece has to be accounted for.

Cut Where the Cast Happens
Cutting is done at the plant that casts the bar, not downstream at the foundry that charges it. Segments are taken from the same round bar supplied as full lengths across the high temperature alloy bar supply at this plant, so the cut arrives with the lot record attached and the foundry receives a charge rather than a length of bar to break down.
That arrangement changes what the charging floor needs. There is no saw on the critical path, nothing left over from a length that did not suit the furnace, and no second record to keep for the pieces, because the cut was written on the same order as the composition.

Specifications
| Product Form | Cast bar, round section, cut into charging segments |
| Segment Length | Cut to the charging length in use at the foundry |
| Diameter | 8.0 mm to 200 mm |
| Melting Route | Vacuum melting |
| Casting Route | Bar casting |
| Grade Agreement | Composition and impurity limits fixed on the order |
| Segment Mass | Stated per diameter and length |
| Internal Quality | Structure assessed for uniformity where the order calls for it |
| Surface | Clean, consistent finish |
| Piece Count | Carried per case on the packing list |
| Lot Record | Mill test certificate issued for the heat |
| Documents | Mill test certificate, packing list, invoice, bill of lading |
| Packing | Bundled segments in export wooden cases |
| Destination | Korea, to the port named on the enquiry |
| Delivery | 15-30 days from order confirmation |
Key Strengths
Cut to the charging length in use at the foundry, so nothing is broken down on arrival.
Sections from 8.0 mm to 200 mm, taken from the bar supplied in full lengths.
Segment mass given per diameter and length with the offer.
Case markings that tie a delivery back to the campaign behind it.
Lot certificate issued for the heat the pieces were cut from.
Technical Details
How the Charge Length Reaches the Order
The length is not held in a catalogue. It comes out of the foundry's own charging practice, written on the enquiry and carried onto the order, and the bar is cut to it while the lot is still on site. A shop that fills its crucible by hand may take a shorter piece than one feeding a larger furnace, and either way the cut is quoted against the same specification sheet rather than against a figure taken from a catalogue.
Counting Pieces Against the Charge Sheet
A charge is weighed, and cut pieces make that weight visible on the scale. The floor sets them on until the charge sheet is satisfied, and the count recorded per case can be checked against the packing list without turning a bar length into a figure first. Where a shop logs what entered each heat, the count gives the entry a firm starting point rather than an estimate.

What Has to Be Agreed Before the Cut Is Placed
The section and the cut length are settled first, and the quantity and the grade agreement with them, because the cut is written into the cast rather than performed on it afterwards. A length added to a confirmed order puts a second operation on a lot that has already been scheduled, and a length changed once the cast has been made is quoted as fresh material.
Case Marks That Follow a Campaign
Where a shop charges in campaigns, the markings on the case are what tie a delivery back to the order behind it. The grade and the cut length sit on the case, and the lot number carries the pieces to the certificate, so a later delivery for the same campaign can be reconciled against the earlier one without every case being opened.

What a Korea-Bound Lot Looks Like
Consignments for Korea are quoted to the port the buyer nominates, with Busan the gateway most of them leave through. Because the pieces are already at charge length when the container is opened, the floor weighs the charge and files the certificate, and the material is not handled a further time before it goes into the crucible.
Nothing about the destination changes the specification. The section and the cut length, along with the grade agreement, are the same whether the consignment is booked to Busan or to any other port, and the cast is made once rather than to a regional variant.
Quality Assurance
The pieces are cut from bar cast to the grade agreed on the order, and the lot is checked before it is packed. Cutting is the step a segment order adds, so the surface is examined after the cut as well as before it, and the order may call for the structure to be assessed for uniformity. What the certificate describes is the heat the bar came from, and it is issued once the lot has been released for packing.
References
The cut supplied on this line is taken from bar cast to the composition agreed on the order, and the grade designations applied to it come from the cast grade series for high-temperature alloys in the Chinese standard system. Reading a segment lot means reading the record of the heat it came from, which is what the certificate issued alongside it refers to. Notes on charging practice for induction melting are drawn from ASM International's handbook covering nickel and cobalt alloys and from materials published by the Nickel Institute.
Packaging & Delivery
Bundles of cut pieces are wrapped to keep moisture out and packed into export wooden cases, each case carrying the grade and the cut length while the lot number ties it to the certificate for the heat. Along with the material go the packing list, the commercial invoice and the bill of lading, with a certificate of origin added where the consignee's clearance requires one. A segment lot takes 15-30 days from order confirmation, and the freight figure is quoted for the port named on the enquiry under FOB, CFR or CIF terms.

About DZX Alloy
The Changzhou, Jiangsu plant of Jiangsu DZX Technology Co., Ltd. has melted and processed alloys since 2002, holds ISO 9001 and SGS audited systems, and ships to buyers in 60+ export countries. Consignments leave that plant already sized to the charging length the customer nominated, and the export buyers who order this way have been doing so for as long as the grades have been cast here.

Send the grade and the length the furnace accepts, with the quantity, and the offer states the section and the mass per piece.
FAQ
Q: How does a segment differ from bar sold by length?
A: A segment is cut to the length the furnace accepts rather than to a nominal length, so a piece goes into the charge without being broken down first.
Q: Whose charging practice sets the cut?
A: The foundry's. The length in use at the shop is written on the enquiry, and the bar is cut to it before the cases are closed.
Q: Is the piece mass known before the order is placed?
A: Yes. The offer gives the mass of a piece for each diameter and length quoted, which is what the floor needs for its lifting plan.
Q: Does cutting change what the certificate covers?
A: No. The pieces come from bar cast to the grade agreed on the order, and the certificate for that heat is the one that travels with the cases.
Q: Which sections can be cut into segments?
A: Bar is cast in round sections from 8.0 mm to 200 mm, and a segment order is cut from the section the foundry charges.
Q: How are the pieces packed for a Korean consignment?
A: The pieces travel in export wooden cases, and each case carries a lot number that leads back to the certificate for the heat, with the case numbers set out on the packing list.
Q: What has to be agreed before the cut is placed?
A: The section and the cut length, with the quantity and the grade agreement, since the cut is written into the cast order rather than added to it later.
Q: How does a piece count help at the charging floor?
A: A charge is weighed, and pieces let the weight be assembled on the scale and checked against the charge sheet without measuring anything first.
Q: Can one consignment carry more than one cut length?
A: Yes, where the sections differ, and each cut length is listed separately on the order and repeated on the packing list so the cases can be told apart.
Q: What is the production window for a segment lot?
A: A lot is scheduled over 15-30 days from order confirmation, and the cutting is part of that schedule rather than something done once the cast is finished.